Spirit Hits the Water in Three Months!

We were notified today that on or about February 27th Spirit should leave the Wroxham facility on one big flatbed truck for a several hour trip south to Fox’s Marina in Ipswich. Once there she’ll have her mast installed before being lowered into the water for several weeks of commissioning – the finalization of a process that started in July of 2013 when we contracted for the build. Commissioning, sea trials and handover should conclude by mid May. Not that we’re counting but Spirit will be ours in approximately 163 days.

Below are some progress photos taken today.

Spirit showing off her black boot and cove lines

Spirit showing off her black boot and cove lines

Aft deck with the davits

Aft deck with the davits

Salon windows installed

Salon windows installed

Forward head almost ready to use

Forward head almost ready to use

Beautiful Hansgrohe fixtures for the sinks

Beautiful Hansgrohe fixtures for the sinks

Electrical panel all wired

Electrical panel all wired

Breakers

Major breakers

Owners cabin being trimmed out

Owners cabin being trimmed out

Pedestal control panel being wired

Pedestal control panel being wired

Who says perfection has to be neat?